Flying wires started

Checked on my primer-ed rudder petals and was very happy with how they turned out. 

Checked the side and top stringers, cut a couple zip ties that were holding things in place, and I'm very happy with how they turned out.

Re-leveled the frame a bunch to get the horizontal stab fixed into place with 1.6 degrees down on it's leading edge. Once that was drilled and secured I started the laborious process of squaring up the vertical and horizontal stabs and starting on the flying wires. I only got through making the first two for the leading edge top, but I have to say I'm really happy with how they turned out. Factory told me to do one washer for sizing, then because I have the stainless steel tabs I can remove them for the final install to make it tighten up.

Hrs: 5 Total: 46


Comments

Popular posts from this blog

30 Sept 2021 Wing work cont.

Month off!!! Time. To. Work.

Wing work