Floor panels continued
I've spent a lot of time fitting, trimming, and de-burring aluminum sheet for the floor and baggage panels.
Drilled the screw holes and opened up the frame attachment tabs for riv-nuts for the front footwell area so far. Working on the aft baggage floor panel attachment now.
There are chromoly fixtures coming through the floor in the forward baggage panel area, which I need to figure out how to make cutouts for, and what they're used for before I complete that one. Also have a lot of cutting and fitting to do on the aft baggage wall. I decided to use a slightly lighter weight aluminum panel, and cut it short for view access down the rear of the fuselage.
Hrs: 3 Total: 22
Comments
Post a Comment