30 Sept 2021 Wing work cont.
As I'm now back from my OCONUS duties, I've started back into the Highlander project. It was sitting for the hiatus with the wing fuel tank supports ALMOST done. I was able to wrap them up (4 per wing) as I cleaned up my workspace and figured out the next moves. Next was locating and securing the 1st rib into place. With the AL wing tanks fitted, next was the flush riveted nut plates on the cap strips next to tanks on either side. That was the first time I've seriously bucked rivets, and while daunting, went better than expected. The fuel tanks are covered with an aluminum sheet, which needs to be bordered by these nut plates to secure it. I've now installed the leading edge portion of angle AL, and will wait for the structural epoxy adhesive to set before flush riveting the corners onto the wooden rib.